Era Oakwood Court sec-5B, Palwal 
Call Now: 0129-4002066

                                                                                                                                                                 Post Query
Era Oakwood Court sec-5B, Palwal
Introduction
Specification
Price
Images
Download


Updated On:07 Jun 2011

Project
Era Oakwood Court sec-5B, Palwal

Developer
Era Oakwood Court sec-5B, Palwal

Project Image
Era Oakwood Court sec-5B, Palwal
Post Query
Price List
Oakwood Court sec-5B, Palwal
Revised Payment Plan
S.No. Super area Accommodation Basic Sale Price Amount(Rs)
1 1220 2 BR, Drawing-Dining, Kitchen with utility balcony, 2 toilets. Rs. 1550/- per sq.ft. Rs-18,91,000/-
2 1360 2 BR, Study, Drawing-Dining, Kitchen with utility balcony & 2 toilets & other balconies. Rs. 1550/- per sq.ft. Rs-21,08,000/-
3 1500 3 BR, Drawing-Dining, Kitchen with utility balcony & 3 toilets & other balconies. Rs. 1550/- per sq.ft. Rs-23,25,000/-
Note: 8% Discount on BSP will be provided in case of down payment option.
Inaugral discount of Rs-100/sq.ft. is for a limited period only.
Additional Charges (One time Payment)
1 Car Parking Covered / Open - Rs. 100000/75000
2 Power Backup Installation Charges
Minimum 1 KVA (2 BR) & 2 KVA (3 BR)
Rs. 15,000/- per KVA
3 Interest Free Maintenance Security. Rs. 40/- per sq.ft.
4 Club Membership Rs. 35,000/-
5 Electric installation & Fire fighting charges. Rs. 30/- per sq.ft.
(PLC) Preferential Location Charges
1 First Floor 4 %
2 Second Floor 3 % of BSP
3 Third Floor 2 % of BSP
4 Green or Club Facing Rs. 50/- per sq.ft.
PLAN-A
Down Payment Plan - 8% Discount on BSP.
At the Time of Booking Booking Amount
Within 45 Days of Booking 87% of BSP + 50% Additional Charges + 100% PLC + EDC & IDC.
At the time of offer Possession 5% of BSP + 50% Additional Charges
Note-Discount Rate of 8% can be reduced.withdrawn by the company from time to time.
Plan-B
Construction - Linked Plan
Registration 5% Round off
With in 45 Days of Registration and on allotment 10% of BSP
Within 90 Days of Registration 5% of BSP
On Start of excavation 10% of BSP
On Completion of foundation 7.5% of BSP + 50% EDC & IDC
On Completion of Ground Floor roof Slab casting 7.5% of BSP + 50% EDC & IDC
On Completion of Second Floor roof Slab casting 10% of BSP + 50% PLC
On Completion of Fifth Floor roof Slab casting 10% of BSP + 50% PLC
On Completion of Seventh Floor roof Slab casting 10% of BSP
On Completion of Last Floor roof Slab casting 7.5% of BSP
On Completion of Internal Plaster 7.5% of BSP
On Completion of flooring 5% of BSP + 50% Additional Charges
At the time of Possession 5% of BSP + 50% Additional Charges
Note:-
  • Prices are firm & escalation free from the respective dates of Booking.
  • Company reserves the right to change the prices without notice. Prices ruling on the date of booking shall be applicable.
  • The above prices are Exclusive of External Development Charges (EDC) & Infrastructure Development Charges. At present ther charges are Rs. 180/- per sq.ft. In case of any upward revision thereof or any other charges by any Govt. agencies in.
  • Other charges as indicated in the Buyer Agreement shall be payable additionally.
  • The Payment due for Construction Linked Plan on the basis of present stage of construction shall be paid within 30 days of booking and the balance shall be paid as per the above plan.
  • Registration, Stamp Duty & Other charges as applicable, would be payable by the allottee at the time of execution of sale deed.
  • Any Additional facility, if provided or charges applicable in future will be charged extra.
  • The above area are super built-up area which include covered plus proportionate share of common area such as stair case, passage, community space, lift facilities, etc.
  • All Building plans, layout, specifications etc,. are tentative & subject to variation & modification as decided by the company or competent authority sanctioning such plans.
All Rights Reserved.Innovations Computech Pvt Ltd © Copyright 2011