| Construction Linked Installment Plan |
| At the Time of Registration |
35% of BSP + 50% PLC (if any) + 50% EDC + 50% IDC |
| At start of excavation |
7.5% of BSP + 50% PLC (if any) + 50% EDC + 50% IDC |
| On casting of Stilt roof |
7.5% of BSP + 50% EEC + 50% FFC |
| On casting of 1 floor slab |
7.5% of BSP + 50% EEC + 50% FFC Plus Other Charges |
| On casting of 2 floor roof |
7.5% of BSP |
| On casting of 4 floor roof |
7.5% of BSP |
| On casting of 5 floor roof |
7.5% of BSP |
| On casting of 7 floor roof |
6% of BSP |
| On casting of last floor of the tower |
6% of BSP |
| On completion on internal plaster |
6% of BSP |
| On offer of possession |
2% of BSP+ Stamp Duty and all other Charges as applicable |